| Porch ceiling |
![]() |
| Dining room ceiling |
![]() |
| Exterior walls closed up |
![]() |
| Dining room bay window taking shape |
![]() |
| Kitchen plumbing goes in and corner west facing window gives us the sunsets. |
![]() |
| Roofing material gets escalated up to the top. |
![]() |
| Decorative moldings on the crown start to get installed. |
![]() |
| The team adds one layer of molding at a time. |
![]() |
| Existing fish scale pattern will be mimicked throughout |
![]() |
| Addition is wrapped and we are almost "zipped up" |
![]() |
| Roof goes on in three days. |
![]() |
| South facing wall is wrapped. |
![]() |
| Complicated plumbing assemblies in the laundry room. Water is under pressure. |
![]() |
| Shower side shows the many connections required to give us the hand held. |
![]() |
| Finding space to put towel bars is a challenge with the water and electric lines everywhere. |
![]() |
| Ceiling will hold fans, chandeliers counter weighted work light and recessed lights. |
![]() |
| Above the kitchen is the reflective sub roof, this layer should reduce transfer of heat in and cool out. |
![]() |
| Electric sub panel, even the upgraded main panel wasn't enough to manage the levels of light. |
![]() |
| From the west, it is really looking like a house. |
![]() |
| Front door inset glass arrived. This was salvaged from 100+ year old house and will be placed in our front door. |
![]() |
| Roofing layers went up to seal roof. Rain is on the way. |
![]() |
| Even the front dormer got a new roof. The original pattern and paint have been preserved. |